Auryn Resources Reports Remaining RAB Drill Results from 2016 Program and Identifies Two New High-Grade Boulder Trains at Anuri and Ridge Prospects

Finanznachrichten News

VANCOUVER, BRITISH COLUMBIA -- (Marketwired) -- 11/25/16 -- Auryn Resources Inc. (TSX: AUG)(OTCQX: GGTCF) ("Auryn" or the "Company) is pleased to announce results from its 2016 drill and boulder-sampling programs from its Committee Bay gold project located in Nunavut, Canada. Auryn successfully intersected gold in the majority of the RAB holes drilled across a set of east-west trending structures at Anuri that were the primary focus of the 2016 drill program. Highlights from the drilling include; 9.14 meters at 1.04g/t Au, 7.62m @ 1.05g/t, and 3.05m @ 2g/t Au (see Figure 1). The structure intersected is interpreted by Auryn to be a secondary structure based on the discovery of a new high-grade boulder train at Anuri that has a source along a prominent regional north-south trending fault zone adjacent to the 2016 drilling area (see Figure 1). The top 5 samples from the new boulder train are as follows: 45.9g/t Au, 41.5g/t Au, 33.3g/t Au, 14.55g/t Au, and 12.65g/t Au.

Shawn Wallace, President and CEO stated, "The progress at the Committee Bay project achieved over the last two years has been significant. We have completed extensive surface work over 85% of the nearly 300km long greenstone belt and importantly have drastically reduced drill costs. Our 2016 RAB drill campaign was limited to 2 target areas in the southwest of the project identified during the limited 2015 program; however, based on our 2016 surface work, we have properly defined 17 high priority drill ready targets across the belt."

RAB Drilling Results:

The RAB drilling undertaken this year successfully intersected gold-bearing structures underneath till cover validating our approach to target the source rock of gold-in-till anomalies and mineralized boulder trains. The program at the Anuri prospect targeted an east-west structure where gold mineralization was encountered consistently throughout the drill holes. The remaining unreleased highlights from this program are listed below in Table 1 with the complete drill results from the remainder of the Anuri drilling presented in Appendix A.

Table 1: Highlights from remaining 2016 RAB drill holes:

----------------------------------------------------------------------------
Target Area             Hole ID       From         To     Length    Grade Au
                               ---------------------------------------------
                                  (meters)   (meters)   (meters)         g/t
----------------------------------------------------------------------------
Anuri                  16ARR016      92.96     100.58       7.62        1.05
----------------------------------------------------------------------------
Anuri                  16ARR022      39.62      48.77       9.14        1.04
----------------------------------------------------------------------------
Muskox                 16MXR005      62.48      65.53       3.05        2.02
----------------------------------------------------------------------------

Boulder Sampling results:

The boulder sampling program was designed to aid in developing high-grade drill targets for 2017 by screening prospective boulder trains identified in high-resolution drone imagery. This program focused on certain areas within the Anuri and Three Bluffs corridors, targeting only eight discrete boulder trains that represent only a fraction of those identified across the belt (see Figure 2). Of the boulder trains sampled, two were identified as containing high-grade gold values, one at Anuri and the other, referred to as Ridge, located in the proximity of the Three Bluffs deposit.

Table 2 - High-grade boulders above 2g/t gold sampled from the Anuri boulder train

----------------------------------------------------------------------------
        Sample ID   Au_g/t                  Au g/t                    Au g/t
----------------------------------------------------------------------------
1         K781071     45.9  10    S695021     7.31  19      S695018     3.31
----------------------------------------------------------------------------
2         S695000     41.5  11    S695010     6.85  20      K781029      3.1
----------------------------------------------------------------------------
3         K781073     33.3  12    S695031     5.96  21      S694996     2.86
----------------------------------------------------------------------------
4         S694992    14.55  13    S695030     5.75  22      S695012     2.67
----------------------------------------------------------------------------
5         S694983    12.65  14    S695007     5.53  23      S695033      2.4
----------------------------------------------------------------------------
6         K781062    12.15  15    S695017     4.73  24      K781042     2.28
----------------------------------------------------------------------------
7         S695015     9.12  16    K781063     4.29  25      S695019     2.19
----------------------------------------------------------------------------
8         S694999      8.8  17    K781072     3.97  26      K781050     2.09
----------------------------------------------------------------------------
9         S694991     8.52  18    S695032     3.39
----------------------------------------------------------------------------

The newly identified high-grade boulder train at the Anuri prospect has demonstrated a source area to be along a major N-S fault zone that was not drill tested during the 2016 summer RAB drilling program (see Figure 2). This boulder train is 2.6 km long with the 112 samples taken from this train averaging 2.43g/t Au. The total strike length of the north south oriented structure that has the potential to be gold bearing based on regional till sampling and boulder train sampling, is approximately 8 km and will be drill tested during the 2017 summer exploration program.

Table 3 - High-grade boulders above 2g/t gold sampled from Three Bluffs boulder trains

----------------------------------------------------------------------------
    Sample ID    Au g/t         Prospects     Sample ID  Au g/t    Prospects
----------------------------------------------------------------------------
1     S640042      11.0 Ridge/Ridge South   7   S640120    2.52     Avinngaq
----------------------------------------------------------------------------
2     K781116      6.16 Ridge/Ridge South   8   S695047    2.52   Prospector
----------------------------------------------------------------------------
                                                                 Ridge/Ridge
3     S640051      4.47 Ridge/Ridge South   9   K781104    2.33        South
----------------------------------------------------------------------------
                                                                 Ridge/Ridge
4     K781084      3.75        Prospector  10   S640048    2.28        South
----------------------------------------------------------------------------
                                                                 Ridge/Ridge
5     S640023      2.56 Ridge/Ridge South  11   S640050    2.03        South
----------------------------------------------------------------------------
6     K781090      2.55        Prospector
----------------------------------------------------------------------------

The newly identified boulder train at the Ridge prospect demonstrates the potential for additional high-grade discoveries within the Three Bluffs deposit region. The Ridge prospect is undrilled and is one of 17 targets that is planned to be tested during a 2017 summer RAB drill program. In addition, boulder samples taken from the Prospector and Avinngaq prospects demonstrate the potential for multiple sources of gold mineralization in a subtle 20 km long north south trending structural corridor that was defined from a 2016 high resolution magnetics and EM airborne geophysics survey (Fig 1).

Auryn COO & Chief Geologist Michael Henrichsen commented, "The Committee Bay Greenstone Belt remains a singular opportunity for the potential of multiple high grade discoveries. Our innovative approach over the last 2 years has led us to not only lower costs in the Arctic but to a develop the most robust targets across the entire belt with the largest gold signatures that we look forward to drilling in 2017".

About Auryn

Auryn Resources is a technically driven junior mining exploration company focused on delivering shareholder value through project acquisition and development. The Company's management team is highly experienced with an impressive track record of success and has assembled an extensive technical team as well as a premier gold exploration portfolio.

Auryn is focused on scalable high-grade gold deposits in established mining jurisdictions, which include the Committee Bay gold project located in Nunavut, the Homestake Ridge gold project in British Columbia and a portfolio of gold projects in southern Peru.

ON BEHALF OF THE BOARD OF DIRECTORS OF AURYN RESOURCES INC.

Shawn Wallace, President and CEO of Auryn Resources

Cautionary Language and Technical Disclosures:

Michael Henrichsen, P.Geo, COO of Auryn, is the Qualified Person who assumes responsibility for the technical disclosures in this press release.

RAB Drilling Results

Intercepts were calculated using a minimum of a 0.25 g/t Au cut off at beginning and end of the intercept and allowing for no more than four consecutive samples (six meters) of less than 0.25 g/t Au.

Analytical samples were taken using 1/8 of each 5ft (1.52m) interval material (chips) and sent to ALS Lab in Vancouver, BC for preparation and analysis. All samples are assayed using 50g nominal weight fire assay with atomic absorption finish (Au-AA26) and multi-element four acid digest ICP-AES/ICP-MS method (ME-MS61). QA/QC programs using internal standard samples, field and lab duplicates and blanks indicate good accuracy and precision in a large majority of standards assayed.

True widths of mineralization are unknown based on current geometric understanding of the mineralized intervals.

Boulder Sampling

Approximately 1kg of material was collected for analysis and sent to ALS Lab in Vancouver, BC for preparation and analysis. All samples are assayed using 50g nominal weight fire assay with atomic absorption finish (Au-ICP21) and multi-element four acid digest ICP-AES/ICP-MS method (ME-MS41). QA/QC programs using internal standard samples, field and lab duplicates and blanks indicate good accuracy and precision in a large majority of standards assayed.

Rock grab samples are selective by nature and are unlikely to represent average grades on the property.

Neither Toronto Stock Exchange nor the Investment Industry Regulatory Organization of Canada accepts responsibility for the adequacy or accuracy of this release.

This release includes certain statements that may be deemed "forward-looking statements". All statements in this release, other than statements of historical facts, that address events or developments that the company expects are forward-looking statements. Although the Company believes the expectations expressed in such forward-looking statements are based on reasonable assumptions, such statements are not guarantees of future performance and actual results or developments may differ materially from those in the forward-looking statements. For more information on the Company, investors should review the Company's continuous disclosure filings that are available at www.sedar.com.

To view 'Figure 1', please visit the following link: http://media3.marketwire.com/docs/aury1125.pdf

To view 'Figure 2', please visit the following link: http://media3.marketwire.com/docs/aury21125.pdf

Appendix A: Remaining RAB holes from Anuri prospect (complete table)

----------------------------------------------------------------------------
Target Area          HoleID        From          To      Length     Grade Au
                           -------------------------------------------------
                               (meters)    (meters)    (meters)          g/t
----------------------------------------------------------------------------
Anuri              16ARR012       97.54      105.16        7.62         0.18
----------------------------------------------------------------------------
Anuri              16ARR014      160.02      161.54        1.52         0.34
----------------------------------------------------------------------------
Anuri              16ARR016       92.96      100.58        7.62         1.05
----------------------------------------------------------------------------
                      incl.       92.96       94.48        1.52         3.23
----------------------------------------------------------------------------
Anuri              16ARR016      106.68      109.73        3.05         0.53
----------------------------------------------------------------------------
Anuri              16ARR016      118.87      120.40        1.52         0.32
----------------------------------------------------------------------------
Anuri              16ARR017       28.96       30.48        1.52         0.45
----------------------------------------------------------------------------
Anuri              16ARR017      120.40      123.44        3.05         0.38
----------------------------------------------------------------------------
Anuri              16ARR017      140.21      143.26        3.05         0.31
----------------------------------------------------------------------------
Anuri              16ARR018       73.15       74.68        1.52         0.54
----------------------------------------------------------------------------
Anuri              16ARR020       24.38       25.91        1.52         0.28
----------------------------------------------------------------------------
Anuri              16ARR020      109.73      111.25        1.52          0.6
----------------------------------------------------------------------------
Anuri              16ARR021       45.72       47.24        1.52         0.26
----------------------------------------------------------------------------
Anuri              16ARR021       54.86       56.39        1.52         0.29
----------------------------------------------------------------------------
Anuri              16ARR022       39.62       48.77        9.14         1.04
----------------------------------------------------------------------------
                      incl.       39.62       41.15        1.53          2.7
----------------------------------------------------------------------------
Anuri              16ARR022      181.36      182.88        1.52         2.14
----------------------------------------------------------------------------
Anuri              16ARR023       59.44       60.96        1.52         1.46
----------------------------------------------------------------------------
Anuri              16ARR023       64.01       65.53        1.52         0.55
----------------------------------------------------------------------------
Anuri              16ARR023       74.68       76.20        1.52         0.27
----------------------------------------------------------------------------
Anuri              16ARR025        9.14       10.67        1.52         0.63
----------------------------------------------------------------------------
Anuri              16ARR025       24.38       25.91        1.52         0.76
----------------------------------------------------------------------------
Anuri              16ARR025       47.24       48.77        1.52          0.4
----------------------------------------------------------------------------
Anuri              16ARR026      102.11      103.63        1.52         0.26
----------------------------------------------------------------------------
Anuri              16ARR026      108.20      109.73        1.52         1.47
----------------------------------------------------------------------------
Anuri              16ARR028      115.82      117.35        1.52         1.56
----------------------------------------------------------------------------
Anuri              16ARR028      123.44      124.97        1.52         0.96
----------------------------------------------------------------------------
Anuri              16ARR030       45.72       47.24        1.52         0.34
----------------------------------------------------------------------------
Anuri              16ARR030       97.54       99.06        1.52          0.3
----------------------------------------------------------------------------
Anuri              16ARR032      108.20      109.73        1.52         0.38
----------------------------------------------------------------------------
Anuri              16ARR034       18.29       19.81        1.52         0.41
----------------------------------------------------------------------------
Muskox             16MXR001       12.19       13.72        1.52         0.45
----------------------------------------------------------------------------
Muskox             16MXR001       22.86       24.38        1.52         0.34
----------------------------------------------------------------------------
Muskox             16MXR001       91.44       97.54        6.10         0.35
----------------------------------------------------------------------------
Muskox             16MXR001      102.11      103.63        1.52         0.39
----------------------------------------------------------------------------
Muskox             16MXR003      114.30      115.82        1.52         1.78
----------------------------------------------------------------------------
Muskox             16MXR003      185.93      187.45        1.52         0.39
----------------------------------------------------------------------------
Muskox             16MXR004       28.96       30.48        1.52         0.86
----------------------------------------------------------------------------
Muskox             16MXR004      146.30      147.83        1.52          0.3
----------------------------------------------------------------------------
Muskox             16MXR005       30.48       32.00        1.52         0.36
----------------------------------------------------------------------------
Muskox             16MXR005       48.77       50.29        1.52         0.54
----------------------------------------------------------------------------
Muskox             16MXR005       62.48       65.53        3.05         2.02
----------------------------------------------------------------------------

Contacts:
Auryn Resources Inc.
Jay Adelaar
Manager of Investor Relations
(778) 729-0600

© 2016 Marketwired
Treibt Nvidias KI-Boom den Uranpreis?
In einer Welt, in der künstliche Intelligenz zunehmend zum Treiber technologischer Fortschritte wird, rückt auch der Energiebedarf, der für den Betrieb und die Weiterentwicklung von KI-Systemen erforderlich ist, in den Fokus.

Nvidia, ein Vorreiter auf dem Gebiet der KI, steht im Zentrum dieser Entwicklung. Mit steigender Nachfrage nach leistungsfähigeren KI-Anwendungen steigt auch der Bedarf an Energie. Uran, als Schlüsselkomponente für die Energiegewinnung in Kernkraftwerken, könnte dadurch einen neuen Stellenwert erhalten.

Dieser kostenlose Report beleuchtet, wie der KI-Boom potenziell den Uranmarkt beeinflusst und stellt drei aussichtsreiche Unternehmen vor, die von diesen Entwicklungen profitieren könnten und echtes Rallyepotenzial besitzen

Handeln Sie Jetzt!

Fordern Sie jetzt den brandneuen Spezialreport an und profitieren Sie von der steigenden Nachfrage, der den Uranpreis auf neue Höchststände treiben könnte.
Werbehinweise: Die Billigung des Basisprospekts durch die BaFin ist nicht als ihre Befürwortung der angebotenen Wertpapiere zu verstehen. Wir empfehlen Interessenten und potenziellen Anlegern den Basisprospekt und die Endgültigen Bedingungen zu lesen, bevor sie eine Anlageentscheidung treffen, um sich möglichst umfassend zu informieren, insbesondere über die potenziellen Risiken und Chancen des Wertpapiers. Sie sind im Begriff, ein Produkt zu erwerben, das nicht einfach ist und schwer zu verstehen sein kann.