Vancouver, British Columbia--(Newsfile Corp. - March 1, 2024) - IMPACT Silver Corp. (TSXV: IPT) (OTCQB: ISVLF) (FSE: IKL) ("IMPACT" or the "Company") invites investors and stakeholders to visit the Company at Booth #2505 at The Prospectors & Developers Association of Canada Convention (PDAC) at the Metro Toronto Convention Centre (MTCC) from Sunday March 3, 2024 to Wednesday March 6, 2024.
ABOUT IMPACT SILVER
IMPACT Silver Corp. (TSXV: IPT) is a successful producer-explorer with two mining projects in Mexico.
- Royal Mines of Zacualpan Silver-Gold District: IMPACT owns 100% of the 211 km2 Zacualpan project in central Mexico where three underground silver mines and one open pit mine feed the central 500 tpd Guadalupe processing plant. To the south, the Capire Project includes a 200 tpd processing pilot plant adjacent to an open pit silver mine with an NI 43-101 inferred mineral resource of over 4.5 million oz silver, 48 million lbs zinc and 21 million lbs lead (see IMPACT news release dated January 18, 2016 for details and QP statement). Company engineers are reviewing Capire for a potential restart of operations. Over the past 17 years, IMPACT has placed multiple zones into commercial production and produced over 12 million ounces of silver, generating revenues over $256 million, with no long-term debt.
- Plomosas Zinc-Lead-Silver District: Plomosas is a high-grade zinc producer in northern Mexico with exceptional exploration upside potential where only 600m of the 6 km-long structure have seen modern exploration to date. This is in addition to other exploration targets on the 3,019-hectare property including untested copper-gold targets with indications of high-grade material from surface. Regionally, Plomosas lies in the same mineral belt as some of the largest carbonate replacement deposits in the world.
Quality Control/Quality Assurance
Samples take by the Company were analyzed by ALS Group, an internationally recognized analytical services provider, and by the laboratory at the Plomosas mine. Samples analyzed by ALS used fire assay with an AA finish for gold and a multielement ICP package for other metals. Assays for metals >1% used an overlimit ICP method. For samples with >30%Zn a wet chemical method is used. For analyses at the mine, all metals are analyzed by AA. For some samples with >30% Zn, the analysis from the mine lab was used if an overlimit from ALS was not available. Certified Reference Materials and internal control samples are added to the sample stream at regular intervals to track accuracy of assays.
Qualified Person and NI 43-101 Disclosure
Craig Gibson, PhD, CPG, is a "Qualified Person" within the meaning of NI 43-101 and has approved the technical information contained in this news release.
Additional information about IMPACT and its operations can be found on the Company website at www.IMPACTSilver.com. Follow us on Twitter @IMPACT_Silver and LinkedIn at https://www.linkedin.com/company/impactsilver
On behalf of IMPACT Silver Corp.
"Frederick W. Davidson"
President & CEO
For more information, please contact:
Jerry Huang
CFO | Investor Relations
(604) 664-7707 or inquiries@impactsilver.com
(778) 887 6489 Direct
Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.
Forward-Looking and Cautionary Statements
This IMPACT News Release may contain certain "forward-looking" statements and information relating to IMPACT that is based on the beliefs of IMPACT management, as well as assumptions made by and information currently available to IMPACT management. Forward-looking information is often, but not always, identified by the use of words such as "seek", "anticipate", "plan", "continue", "planned", "expect", "project", "predict", "potential", "targeting", "intends", "believe", "potential", and similar expressions, or describes a "goal", or variation of such words and phrases or state that certain actions, events or results "may", "should", "could", "would", "might" or "will" be taken, occur or be achieved. Such statements include, but are not limited to, statements with respect to the expected use of proceeds of the Private Placement.
Such forward-looking information involves known and unknown risks and assumptions, including with respect to, without limitations, exploration and development risks, expenditure and financing requirements, title matters, operating hazards, metal prices, political and economic factors, competitive factors, general economic conditions, relationships with vendors and strategic partners, governmental regulation and supervision, seasonality, technological change, industry practices, and one-time events. Should any one or more risks or uncertainties materialize or change, or should any underlying assumptions prove incorrect, actual results and forward-looking statements may vary materially from those described herein. IMPACT does not assume the obligation to update any forward-looking statement.
The Company's decision to place a mine into production, expand a mine, make other production related decisions or otherwise carry out mining and processing operations, is largely based on internal non-public Company data and reports based on exploration, development and mining work by the Company's geologists and engineers. The results of this work are evident in the discovery and building of multiple mines for the Company and in the track record of mineral production and financial returns of the Company since 2006. Under NI 43-101 the Company is required to disclose that it has not based its production decisions on NI 43-101 compliant mineral resource or reserve estimates, preliminary economic assessments or feasibility studies, and historically such projects have increased uncertainty and risk of failure.
To view the source version of this press release, please visit https://www.newsfilecorp.com/release/200108
SOURCE: IMPACT Silver Corp.